SERVICE INSTALLATION
System Development Fees as of July 1, 2024
Meter Size | Current Fee | ||||
---|---|---|---|---|---|
5/8″ x 3/4″ meter | $15,594 | ||||
3/4″ x 3/4″ meter | $15,594 | ||||
1″ meter | $38,996 | ||||
1 1/2″ meter | $77,971 | ||||
2″ meter | $124,753 | ||||
3″ meter | $389,854 | ||||
4″ meter | $389,854 |
*Table above assumes no annual SDC index increase.
Installation charges are based on labor and the actual cost of materials (+30%), plus a system development fee which reflects a cost of investment in the water system to provide service to the property. The above figures are subject to change periodically and shall in no way bind the District to install any service for the charge stated herein.
- Labor = $40/hour
- Backhoe w/operator = $125/hour
- Trencher w/operator = $75/hour
Meter sizes of 6”, 8” and 10” are also available. Contact us for more information.
A 20% deposit (of the system development fee) for the size of the service requested, is to be attached to the application for service. Funds will be deposited upon approval of the application by the Board of Commissioners, or upon installation, whichever occurs first.
Installation fees include material and labor to be charged in addition to service development fees.
All installation charges and fees must be paid before water service will be turned on.
All installations must comply with District, County and State requirements.
Water Service Application Checklist:
- Applicant’s signature
- Complete legal description of property (metes & bounds)
- Sketch of proposed water service
- Deposit
Contractor / Developer Requirements
- Contact the District Office for details.